Rugby road closures: dozens for motorists to avoid over the next fortnight

Rugby's motorists will have 24 road closures to avoid nearby on the National Highways network this week.
Road Closed signs. Tuesday May 12th 2020Road Closed signs. Tuesday May 12th 2020
Road Closed signs. Tuesday May 12th 2020

Rugby's motorists will have 24 road closures to avoid nearby on the National Highways network this week.

And three of them are expected to cause moderate delays – with drivers facing holdups of between 10 and 30 minutes.

Hide Ad
Hide Ad

The latest expected works list, with notes from National Highways, shows that nine closures already in place are expected to carry on this week:

A5, from 8pm October 29 to 5am October 30, slight delays (under 10 minutes): A5 northbound and southbound, Clifton Upon Dunsmore, temporary traffic signals for road markings.

A5, from 8am October 26 to 3.30pm October 30, slight delays (under 10 minutes): A5 northbound and southbound, junction 18 (M1) to Magna Park, mobile lane closures due to maintenance works.

A5, from 8.30pm October 23 to 5.30am November 4, slight delays (under 10 minutes): A5 northbound and southbound, Willey to Wibtoft, Lane closures for survey works.

Hide Ad
Hide Ad

A46, from 8pm October 2 to 6am November 4, moderate delays (10-30 minutes): M6 northbound, jct two to A46 central boulevard, lane closure and carriageway closure for carriageway repairs.

A5, from 8pm October 20 to 5am November 8, slight delays (under 10 minutes): A5 northbound and southbound, DIRFT to Stobarts roundabout, carriageway and lane closures due to maintenance work, diversion via local authority network.

M45, from 6am October 20 to 6pm November 8, slight delays (under 10 minutes): M45 eastbound, Thurlston to Dunchurch, Lane closures due to survey works.

M6, from 8pm October 23 to 6am November 11, slight delays (under 10 minutes): M6 southbound, junction 1, Lane closures for communication works.

Hide Ad
Hide Ad

M1, from 8pm July 18 to 6am December 19, slight delays (under 10 minutes): M1 northbound and southbound, junction 20 to junction 21, Lane closures for communication works.

A46, from 8pm April 24 2023 to 6am September 30 2024, moderate delays (10-30 minutes): A46 both directions Binley roundabout to M6 jct two, carriageway closure for major scheme works.

And a further 15 closures will begin over the next two weeks:

M6, from 7pm October 30 to 6am November 3, slight delays (under 10 minutes): M6 northbound, junction 1, Lane closure for works on local authority works.

Hide Ad
Hide Ad

A45, from 9.30am October 31 to 3.30pm November 3, slight delays (under 10 minutes): A45 eastbound, Memorial Island to Thurlaston Interchange, lane closure for horticulture (cutting and planting) works.

A45, from 9.30am October 31 to 3.30pm November 3, slight delays (under 10 minutes): A45 westbound, Thurlaston Interchange to Memorial Island, lane closure for horticulture (cutting and planting) works.

A5, from 8pm November 1 to 5am November 2, slight delays (under 10 minutes): A5 northbound and southbound, Shawell, Lane and gap closure due to maintenance works, diversion via National Highways network.

A5, from 9pm November 2 to midnight, November 3, slight delays (under 10 minutes): A5 Lilbourne, traffic signals due to works on behalf of BT.

Hide Ad
Hide Ad

A45, from 9.30am to 3.30pm on November 6, slight delays (under 10 minutes): A45 eastbound, Leamington road roundabout to Fosse way roundabout, lane closure for vegetation works.

A45, from 9.30am November 6 to 3.30pm November 10, slight delays (under 10 minutes): A45 westbound, Thurlaston Interchange to Memorial Island, lane closure for horticulture (cutting and planting) works.

A45, from 9.30am November 6 to 3.30pm November 10, slight delays (under 10 minutes): A45 eastbound, Memorial Island to Thurlaston Interchange, lane closure for horticulture (cutting and planting) works.

A5, from 9am to 3pm on November 7, slight delays (under 10 minutes): A5 northbound, Willey to Wibtoft, Lane closure for horticultural works.

Hide Ad
Hide Ad

A46, from 9pm November 8 to 6am November 11, slight delays (under 10 minutes): A46 northbound, Walsgrave roundabout to M6 jct two roundabout, carriageway closure for carriageway reconstruction/renewal.

A5, from 9.30am to 3.30pm on November 12, slight delays (under 10 minutes): A5 Watford, traffic signals on behalf of BT.

A5, from 8pm November 13 to 5am November 15, slight delays (under 10 minutes): A5 northbound and southboynd, Dodwells roundabout to Sketchley, temporary traffic signals for electrical works.

M45, from 8pm November 13 to 6am November 15, slight delays (under 10 minutes): M45 westbound, junction 17 (M1) to junction 1, Lane closures due to maintenance work.

Hide Ad
Hide Ad

A46, from 8.30pm November 13 to 5am November 14, slight delays (under 10 minutes): A46 both directions M6 jct two roundabout to A46 Clifford Park roundabout, short stop activities with police rolling road block for survey works.

A5, from 9pm November 13 to 6am November 15, moderate delays (10-30 minutes): M6 northbound, jct one entry slip road, Lane closure and slip road carriageway closure for resurfacing works, diversion using National Highways and local authority networks.

National Highways is responsible for maintaining motorways and major A-roads, so closures of smaller roads will not be included in their schedule.